I was guessing that it was TOO OUTSIDE EDGE.
But I only see that on that one area. And google did not verify it.
What it might be is an 8" drop in the stem wall so that when the slab is poured it is poured OVER the stem wall with a 4" slab then it would give you a 4" foundation wall above the surface of the floor. |
Member Since
04/26/2005
Total Contributions
3411 Posts
|