I am having a 1 story addition with basement added to my house. My contractor says that he can start framing 2 days after the block foundation in built. Is this enough time for the wall to cure and be strong enough.
Thanks
JAck |
Member Since
08/22/2008
Total Contributions
1 Posts
|