We are building our new dream home and have hired a contractor to do our trim/finishing around the windows and doors. He insists it should be heated before starting. Is this a must? or better said, should we do turn on the heat first? The temperature around here is in the 50-70's. |
Member Since
03/04/2006
Total Contributions
1 Posts
|