What is the proper way to apply subflooring to floor joist's when they change direction. Do you continue with the same pattern or do you change the direction of the subfloor pattern to match the joist change? And if you do what is the proper way to make the change? |
Member Since
06/20/2006
Total Contributions
2 Posts
|