Home > Ask a Question > BBS > Floor & Tile > Nailing to the joist

Floor & Tile

Not Logged in.
Moderator Moderated by Handyman Login | Register
RSS
Font Size:
   View Style:  Flat   Tree
Post Reply | Post New Message
Title/Content Author

Nailing to the joist

10/27/2003 09:02 AM binchen

I plan to install 3/4" oak hardwood in my living room and dining room. The subfloor is 5/8" plywood with 2x8 16" span joist. I am going to nail down 3/4" hardwood to the subfloor directly since 5/8" plywood subfloor meets the minimum subfloor requirement. Am I right? Second question, When I nail down the 3/4" hardwood to the subfloor, should I nail to the joist or avoid it?

Thanks.

Member Since
10/27/2003

Total Contributions
3 Posts

Post Reply | Watch this Topic
Indent

Nailing to the joist

10/27/2003 02:39 PM Glenn Good
Indent

Nailing to the joist

10/27/2003 10:23 PM carpetman




About  | Press Room  | FAQ  | Contact  | Sitemap  | Privacy Policy  | Terms of Use  | Help

© 2009 BobVila.com