Home > Ask a Question > BBS > Floor & Tile > Replacing Water Soaked Hardwood Floor

Floor & Tile

Not Logged in.
Moderator Moderated by Handyman Login | Register
RSS
Page: [1]
Font Size:
   View Style: Flat    Tree
Post Reply | Post New Message
Title/Content Author

Replacing Water Soaked Hardwood Floor

05/03/2008 12:37 PM sharpguy

After a significant water leak, we are in the process of replacing hardwood floors layed on screeds.

After removing the 3/4 " flooring and the 2x4 screeds - is it important to remove the tar/adhesive before installing the new screeds and floor? If so why.

Member Since
05/03/2008

Total Contributions
1 Posts

Post Reply | Watch this Topic
Page: [1]








 

About | FAQ | Contact | Sitemap | Privacy Policy | Terms of Use | Help
© BobVila.com 2008