After a significant water leak, we are in the process of replacing hardwood floors layed on screeds.
After removing the 3/4 " flooring and the 2x4 screeds - is it important to remove the tar/adhesive before installing the new screeds and floor? If so why. |
Member Since
05/03/2008
Total Contributions
1 Posts
|