Hi,
We just bought a new house in LA built in 60s and want to add on to the back to add a master bath. The house has a concrete slab foundation so I am not sure how to tie into the existing plumbing. Are the current pipes buried in the concrete slab? How do you find where the run in the floor or do you have to break concrete all the way to an existing bath/kitchen? The house was already very expensive so we would like to minimize the expense and do as much as we can of the project. Any help will be appreciated.
Thanks |