Home > Ask a Question > BBS > Plumbing > closet flange, copper pipe

Plumbing

Not Logged in.
Moderator Moderated by Handyman Login | Register
RSS
Font Size:
   View Style:  Flat   Tree
Post Reply | Post New Message
Title/Content Author

closet flange, copper pipe

03/04/2003 03:52 PM Gumby98

I am retiling my bathroom floor and need to replace the subfloor to accomodate the new tile.
I removed the toilet and want to start replacing the plywood subfloor, however I'm not sure how to remove the toilet flange so that I can lay the new plywood properly and get a nice tight fit around the drain. The drain pipe appears to be 3" copper Type L (the flange ring also looks to be copper). If this is similar to working with smaller copper supply pipe (which I have experience with), I was thinking I could heat up the "bend" fitting below the subfloor and just pull out the flange once the solder melts. Then I could "resweat" the joint when I want to put the flange back after I'm done. However, I've never worked with pipe this thick and didn't know if I was biting off more than I could chew. Does this sound like a good plan? Thanks for any help.

Member Since
03/04/2003

Total Contributions
1 Posts

Post Reply | Watch this Topic
Indent

closet flange, copper pipe

06/25/2003 05:07 PM erik peterson
Indent

closet flange, copper pipe

06/25/2003 09:19 PM plumber Tom




About  | Press Room  | FAQ  | Contact  | Sitemap  | Privacy Policy  | Terms of Use  | Help

© 2009 BobVila.com