I need to replace two 2x10 joists in our kitcheen floor. They have old termite damage in the 2-3 feet closest to the sill. The sill is OK. The joists are open from the basement. Is it better to do the work from above (i.e., remove the kitchen floor and cabinets etc.) or from the basement?
Any suggestions are greatly appreciated. |
Member Since
01/07/2005
Total Contributions
2 Posts
|