I have a number for materials and a number for labor. the markup should cover the overhead and other expenses.
i.e.:
1. 1200 SF of asphalt shingle installed
a. Labor = 1324.00
b. Materials = 1117.00
c. Total cost = 2441.00
d. Selling Price = 2441(X%) + 2441 = Selling Price to client. X = the markup in question. |
Member Since
01/20/2007
Total Contributions
4 Posts
|