You stated that the addition will be next to the existing bath. Check near the wall outsid the bath to see if there is a cleanout for the sewer line. Most older homes had a cleanout located at the rear of the house. you may have to probe or dig as sometimes the cleanout plug is slightly beloe the surface for cosmetic reasons. if you find a cleanout, then you will have a plade to tie into the existing sewer line. as far as water supply lines, you can always tie into the lines for the existing bath. worse case, if LA code allows, is to route the water supply lines thru the attic.
JMHO
Carl |
Member Since
03/22/2004
Total Contributions
506 Posts
|