Storm-Ready Design Project

Removing the Concrete Wall Forms and Planning the Plaster Finish VideoIt has been nearly 12 hours since the concrete was poured on the Punta Gorda, Florida, storm-ready house. The crew from Solid Wall Systems is on site to strip the forms, scrape them, and reoil them with a biodegradable form oil before taking them to the next job. Bob watches as a window buck is stripped away leaving a perfectly clean and square concrete opening in place. Hammers ring as the crew knocks off the wall clips that are specially designed to break away once the walls are set. Bob looks up to see the Simpson Strong Ties that were wet set after the pour protruding from the tops of the walls, waiting to tie down the roof trusses. Bob looks at the finish with Mark Newton of Solid Wall Systems and Jesse Gonzalez of Mercedes Homes. Newton explains that they will apply a skim coat over areas that show voids or imperfections. Gonzalez and the Mercedes crew will finish the walls after they have set for two weeks or so. They will power wash the exterior to remove any residual oil from the forms. Then they will apply a three-coat plaster job using a scratch coat, brown coat, and finish coat to create the look of traditional Florida plaster.


 | Carpentry, Construction & Materials Mercedes Homes - General Contractor
Precise Forms, Inc. - Aluminum form systems for concrete homes and basement foundations
Solid Wall Systems - Aluminum concrete form system
 Miscellaneous Ultimate Chase - Stock Footage And Storm Video Production Services
 Real Estate FLASH (Federal Alliance for Safe Homes) - non-profit, organization dedicated to promoting disaster safety and property loss mitigation
Mercedes Homes - Developer - homes designed and built for comfort, elegance, efficiency, and safety in Florida, Texas, and the Carolinas.
| > View All Product Resources |
|  |

 |
 |
Other Video Clips from this Episode |
 |
 |
 |

  
| Cameron Parker, production manager for Solid Wall Systems, shows Bob how the aluminum forms are prepped and erected for the concrete pour at the Punta Gorda, Florida, storm-ready house. Parker ...
Watch video and view full description
| 
  
| After seven days of steady rain, the crew is ready to pour the concrete for the foundation and slab at the Punta Gorda, Florida, storm-ready home. Bob explains how code ...
Watch video and view full description
| 
  
| Bob is joined by Wayne Sallade, the emergency manager for Charlotte County, Florida. They stand before a residential property that has been condemned since the strike by hurricane Charley. Sallade ...
Watch video and view full description
| 
  
| Bob is joined on the site of the Punta Gorda, Florida, storm-ready home by Jim Crain of Precise Forms. Precise Forms partners with Mercedes Builders to create high-quality, reinforced concrete ...
Watch video and view full description
| 
  
| NOW PLAYING
Removing the Concrete Wall Forms and Planning the Plaster Finish It has been nearly 12 hours since the concrete was poured on the Punta Gorda, Florida, storm-ready house. The crew from Solid Wall Systems is on site to strip the ...
| 
  
| Homeowner Jim Minardi is checking out the layout of his new reinforced concrete home that has materialized from sand after just two days. He joins Bob at the window of ...
Watch video and view full description
|
|  |
 |


 |