
Split-Level Ranch Project

Septic System, Bathroom Fixtures and Windows (HA0204) Bob must deal with an overloaded septic system, by replacing the old clogged tank and leach field. Since the bathroom has already been gutted plumbers begin to install new fixtures, and Ryley shows us how to install a 48-pane window in the front addition. Bob also consults with a landscape architect and they make plans to dress up the yard.
|