Bob gets started on the Cambridge project with architect Greg Rochlin and carpenter Bob Ryley and explores Harvard Square with architectural historian Brian Pfeiffer.
View show summary
|
 | Dates Aired: September 9-15, 1996 | March 10-16, 1997
Work gets started as Greg Rochlin presents architectural plans and demolition begins, revealing an old pocket door. Bob and Ryley take apart the staircase banister. Bob joins Brian Pfeiffer to ...
View show summary
|
 | Dates Aired: September 16-22, 1996 | March 17-23, 1997
With demolition completed, other surprises are revealed. Structural engineer Rene Mugnier explains how to fix the kitchen ceiling and two floors above, which are found to be dangerously unsupported, with ...
View show summary
|
 | Dates Aired: September 23-29, 1996 | March 24-30, 1997
Shingle contractor Chris Clark shows how to assess shingle condition, remove damaged shingles and apply new ones. Bob visits Vancouver, British Columbia, to see how high quality red cedar shingles ...
View show summary
|
 | Dates Aired: September 30-October 6, 1996 | March 31-April 6, 1997
In the basement, groundwork is being laid for a useful finished space. To save headroom, plumbing waste pipes have been laid in trenches in the existing floor and a new ...
View show summary
|
 | Dates Aired: October 7-13, 1996 | April 7-13, 1997
Interior framing and structural additions are well along, and Bob takes a look at the different uses of wooden and metal studs and how they're constructed. Bob tours historic Longfellow ...
View show summary
|
 | Dates Aired: October 14-20, 1996 | April 14-20, 1997
Bob visits the roof where Fred Mitchell is installing a state-of-the-art copper lining in the rebuilt wooden gutter system. Shinglers replace the asphalt roof with the red cedar shingles that ...
View show summary
|
 | Dates Aired: October 21-27, 1996 | April 21-27, 1997
Framing has begun on the new backyard deck, and brickmasons repair the chimney on the third floor. The custom Palladian window from Marvin is installed in the third floor family ...
View show summary
|
 | Dates Aired: October 28-November 3, 1996 | April 28-May 4, 1997
An insulation expert explains the different uses for Owens Corning insulation products. Ryley shows how the redwood decking is added to the backyard deck for optimal drainage and paint deleading ...
View show summary
|
 | Dates Aired: November 4-10, 1996 | May 5-11, 1997
An elaborate and highly efficient HVAC system is installed in the basement and Bob checks out his new system 2000 unit and air handler. Radiant heat is installed in the ...
View show summary
|
 | Dates Aired: November 11-17, 1996 | May 12-18, 1997
Blue board and plastering are underway, and Bob gets quick tips from the pros on how to make the job go more smoothly. Ryley and Danny install a huge double ...
View show summary
|
 | Dates Aired: November 18-24, 1996 | May 19-25, 1997
Bob returns to the Stockbridge, MA landmark home Naumkeag for a tour of the elaborate gardens. On the third floor, we're ready for some interior trim with Ryley. Outside, a ...
View show summary
|
 | Dates Aired: November 25-December 1, 1996 | May 26-June 1, 1997
Work begins on the landscape around the house; Bob assesses the limited space with a landscape architect. An arborist is on site to start trimming the hemlocks away from the ...
View show summary
|
 | Dates Aired: December 2-8, 1996 | June 2-8, 1997
An elaborate staircase gets installed in the kitchen, and plaster repair and ceramic tile installation get underway. Ryley installs a chair rail and replaces the glass in the doors of ...
View show summary
|
 | Dates Aired: December 9-15, 1996 | June 9-15, 1997
Trim and paneling get underway in the entryway, living room, and front hall to return some of the house's original formality and grandeur. Bob takes us on a visit to ...
View show summary
|
 | Dates Aired: December 16-22, 1996 | June 16-22, 1997
A herringbone hardwood floor gets installed in the library, and the California Closet people explain how the dressing rooms are coming together in the master suite. A water purification system ...
View show summary
|
 | Dates Aired: December 23-29, 1996 | June 23-29, 1997
With the decision made on what color to paint the house, Bob takes a look at the prep involved on the exterior. Danny's restoring some old windows using springloaded balances. ...
View show summary
|
 | Dates Aired: December 30-January 5, 1997 | June 30-July 6, 1997
The plumber installs a new toilet and vanity in the powder room, and we take a tour of the Kohler factory in Wisconsin where these fixtures are made. Elaborate, custom ...
View show summary
|
 | Dates Aired: January 6-12, 1997 | July 7-13, 1997
The landscape architects are on site to present their plans for the yard, and we take a look at what's been done to prepare for the work. Bob takes us ...
View show summary
|
 | Dates Aired: January 13-19, 1997 | July 14-20, 1997
The landscape hardscape is underway: a special retaining wall product provides an elevated terrace, and the lower back yard terrace gets paved with bluestone. We visit the home of Frederick ...
View show summary
|
 | Dates Aired: January 20-27, 1997 | July 21-27, 1997
In the kitchen, soapstone countertops, the kitchen sink, and a new Moen faucet get installed. Outside, planting is underway, as the landscapers plant a tree in the bluestone terrace. Bob ...
View show summary
|
 | Dates Aired: January 28-February 2, 1997 | July 28-August 3, 1997
The library's getting a new set of built-in bookshelves, and the alarm and phone systems are installed. The electrician refurbishes a period light fixture for use in the kitchen and ...
View show summary
|
 | Dates Aired: February 3-9, 1997 | August 4-10, 1997
New storm windows are being installed on the outside of the house, and planting is finishing up in the newly designed front yard. The landscape architects are on site to ...
View show summary
|
 | Dates Aired: February 10-16, 1997 | August 11-17, 1997
Bob meets with the interior designers for a look at their color and fabric schemes as they're starting to come together. We get a peek at Bob's new basement workshop, ...
View show summary
|
 | Dates Aired: February 17-23, 1997 | August 18-24, 1997
Good fences make good neighbors, and we'll see what to do when there's a tree in the way. Bob tours the finished state-of-the-art kitchen, complete with appliances from 5-Star, Sub-Zero, ...
View show summary
|
 | Dates Aired: February 24-March 2, 1997 | August 25-31, 1997
This is it! The house is finished, and Bob and the interior designers take a look at how all the fabrics, colors, and furnishings have come together. Kim Sweet puts ...
View show summary
|