 | Dates Aired: December 1-7, 1997 | June 1-7, 1998
Bob introduces the new garage and boat storage project, looking over the plans for the post-and-beam structure with contractor Bob Ryley and architect Paul Pacella of Maine Post and Beam. ...
View show summary
|
 | Dates Aired: December 8-14, 1997 | June 8-14, 1998
Work on the garage foundation continues, with shocking pink Foamular© forms forms by Owens-Corning which double as rigid insulation after the pour. Bob takes us on a tour of an ...
View show summary
|
 | Dates Aired: December 15-21, 1997 | June 15-21, 1998
The garage project gets a real high-tech foundation, as layers of termite proofing, crushed stone, vapor barrier, rigid insulation, and wire mesh go down before the concrete can be poured. ...
View show summary
|
 | Dates Aired: December 22-28, 1997 | June 22-28, 1998
Now that the garage slab is complete, Paul Pacella and the crew from Maine Post and Beam of Cape Cod get started on the framing. The truck arrives and drops ...
View show summary
|
 | Dates Aired: December 29-January 4, 1998 | June 29-July 5, 1998
Post and beam framing continues on the barn project: Ryley puts new decking on the loft area, the ridge beam and rafters go up, and a specialist in 17th-century joinery ...
View show summary
|
 | Dates Aired: January 5-11, 1998 | July 6-12, 1998
Framing completed, the crew's attaching the Insulspan© panels: it's an all-in-one wall product consisting of rigid foam insulation sandwiched between two sheets of sheathing material; in this case, it's oriented ...
View show summary
|
 | Dates Aired: January 12-18, 1998 | July 13-19, 1998
After a quick progress report to check out the inside of the barn, Bob and Ryley install a new Pella© windows and trim it out. Exterior trim and siding are ...
View show summary
|
 | Dates Aired: January 19-25, 1998 | July 20-26, 1998
After showing how to install Velux© in the roof of the barn, our new metal roofing from ATAS is installed around them. It's a standing-seam steel shingle system that's coated ...
View show summary
|
 | Dates Aired: January 26-February 1, 1998 | July 27-August 2, 1998
In what Bob calls "the paranoia show", we'll see how to install all sorts of protection features for the new storage barn. J&G Lightning Protection, Inc. is on site to ...
View show summary
|
 | Dates Aired: February 2-8, 1998 | August 3-9, 1998
Horticulturist Ruth Foster's on site again to help spruce up another Home Again project: she and Bob discuss ways to bring back the native trees and vegetation around the barn ...
View show summary
|
 | Dates Aired: February 9-15, 1998 | August 10-16, 1998
The barn's enormous garage doors are in, and Bob shows how the motorized garage door openers from Sears are installed. Frank Ladarola's back on the site to finish hooking up ...
View show summary
|
 | Dates Aired: February 16-22, 1998 | August 17-23, 1998
With work on the barn nearly completed, Bob gets busy staining the interior, adding a Speed-Rail© to the staircase, and putting together a state-of-the-art workshop. With a truckload of new ...
View show summary
|
 | Dates Aired: February 23-March 1, 1998 | August 24-30, 1998
This is the final visit to the post-and-beam barn project, for a grand tour inside and out and a review of some of the great features installed over the last ...