
  
| Bob is inside the old barn where demolition is still taking place. The old staircase has been removed and the opening above is being enlarged to accommodate the new staircase ...
Watch video and view full description
|

  
| Bob meets up with Ray Adams from Pella to look at the new Pella French doors that Charlie will be installing in the library. The door is from the Architect's ...
Watch video and view full description
|

  
| NOW PLAYING
Installing the French Doors Matt Alexander is getting ready to install the new Pella French doors. The rough opening is 72' x 82'. Originally there had been a window where the doors will be ...
|

  
| Bob tours the newly opened up first floor of the house and the turns his attention to the little family room addition. The wall has been bumped out a couple ...
Watch video and view full description
|

  
| Up in the master bath a Kohler "champagne" tub has been installed. The tub is designed to be filled to the brim and the framing must support the additional weight ...
Watch video and view full description
|