Home > Bob on TV > Home Again > Manhattan Remodel & Cape Cod Affordable > Demolition in the Manhattan Brownstone > Leveling the Floor and Installing the Subfloor Video



Manhattan Remodel & Cape Cod Affordable Project


Leveling the Floor and Installing the Subfloor Video

Bob meets lead carpenter Connor McKenna from Thorough Construction, who is working with the original floor joists in preparation for the hardwood floors. Bob remarks again on the hig-quality craftmanship of the original builders, but notes that the floor joists have been chopped up and hacked through for wiring, plumbing, or gas jobs over the years. McKenna explains that sistering the joists, or applying additional lumber to strengthen the existing timbers, will create a sturdy base and allow them to recreate a level floor. A laser level is used to project a level line throughout the apartment that will be followed for leveling all the new floors. McKenna applies panel adhesive to the tops of the new, sistered joists before laying four-by-eight sheets of Georgia-Pacific Plytanium Sturdifloor on top. This is a tongue-and-groove subfloor that is strong enough to serve as the only layer under hardwood flooring. Once affixed and locked in place, the Plytanium is nailed to the joists with traditional deck screws, never drywall screws, to create a stronger, better, quieter installation for the hardwood floors that will follow.



Additional Bob Vila Showrooms
Circle Redmont - Glass floors & stairs made simply beautiful
Lumber Liquidators - Hardwood Flooring for Less
FloorMall.com - Hardwood Flooring and Area Rugs
Chadsworth's - Columns, Pillars, Pilasters & Balustrades
WARN Works - PullzAll – Lift or Pull 1,000 pounds anytime, anywhere.
Bellawood - Prefinished Hardwood Floors

Carpentry, Construction & Materials
• Fort Hill Construction - Construction
• Georgia-Pacific - Plytanium Underlayment
• HomeSaver - "RectangleFlex" Flexible Stainless Steel Relining Pipe Flue Liner
> View All Product Resources

Other Video Clips from this Episode


Reviewing the Completed Demolition

The furred out walls from the 1940s, the oringinal lathe and plaster, and all the extra building materials have been removed from the 1890s Brownstone, leaving the original brick party ...
Watch video and view full description



NOW PLAYING

Leveling the Floor and Installing the Subfloor

Bob meets lead carpenter Connor McKenna from Thorough Construction, who is working with the original floor joists in preparation for the hardwood floors. Bob remarks again on the hig-quality craftmanship ...



Installing the Chimney Liner

Bob and Chris Vila join Andy Grover of Hallsted Welles Associates for the installation of a new, flexible, stainless-steel chimney liner. Grover has already completed exploratory demolition at the smokebox, ...
Watch video and view full description



Installing Steel-Stud Framing

Bob joins Connor McKenna of Thorough Construction as he works on installing the new steel-stud framing. McKenna is again using the laser level, this time in vertical position, set five ...
Watch video and view full description









 

About | FAQ | Contact | Sitemap | Privacy Policy | Terms of Use | Help
© BobVila.com 2008