Manhattan Remodel & Cape Cod Affordable Project

Choosing Between a Poured Foundation or a Crawlspace VideoBob's back at the Mashpee site where he meets with developer Joe Valle to discuss the foundation that is being poured. Valle explains that the excavation work for an average foundation costs about $5,000 and includes the digging, backfill, and finish grading. The poured foundation also costs about $5,000, divided equally between the cost of labor and the cost of materials. Valle estimates it will take about 30 yards of concrete to pour the average foundation, which is equal to three truckloads. Bob questions the decision to pour a full foundation and wonders if it might not be more economical to build a crawlspace. Valle explains that the advantages of a full basement far outweigh any cost savings from digging and pouring a shallower foundation. The added living space is well worth the cost, especially since the foundation must be dug and poured regardless of the depth. As for a concrete slab, Valle says that the market does not support it in the Massachusetts area. Even with a slab house, a frost wall must be dug and poured, before the concrete arrives for the slab. Once the foundation is poured for this River Hill home, posts are set every 16 inches so that the sill can be bolted to the foundation and the house can be tied down to its base.


 | Carpentry, Construction & Materials Lohr Construction - General Contractor
 Real Estate Housing Assistance Corporation - Delivering safe and stable housing in Cape Cod communities.
River Hill Development / Valle Group Inc - Developer
 Roofing & Siding Louisiana-Pacific - OSB Sheathing
| > View All Product Resources |
|  |

 |
 |
Other Video Clips from this Episode |
 |
 |
 |

  
| NOW PLAYING
Choosing Between a Poured Foundation or a Crawlspace Bob's back at the Mashpee site where he meets with developer Joe Valle to discuss the foundation that is being poured. Valle explains that the excavation work for an average ...
| 
  
| Bob meets with Wes Lohr, the general contractor for the River Hill homes, as his crew sets the sill and the first floor deck to frame the new house. Lohr ...
Watch video and view full description
| 
  
| Bob joins General Contractor Wes Lohr as they frame the back wall of the affordable home in Mashpee, Massachusetts. Lohr walks Bob through the framing process as the deck is ...
Watch video and view full description
| 
  
| Bob continues framing the affordable home in Mashpee, Massachusetts, with General Contractor Wes Lohr. Lohr begins by squaring the wall, which is done by taking measurements from corner to corner ...
Watch video and view full description
|
|  |
 |


 |
Related Tips |
 | Related Videos |
 |
 |  |
|
|
 |
|
|
 |

|