Adding a Third Floor Dormer Bob meets Ryley who is adding a third floor dormer to an existing home. Ryley will be recreating a shed dormer with a hip ... |
 
|
|
Architect Project Plans and Door Demolition Work gets started as Greg Rochlin presents architectural plans and demolition begins, revealing an old pocket door. |
 
|
|
Barn Demolition Bob is inside the old barn where demolition is still taking place. The old staircase has been removed and the opening above is ... |
 
|
|
Block Wall Demolition Bob and Ed Weller meet to demolish a block wall to open up the room for the remodel. An electrician has disconnected the ... |
 
|
|
Bob Visits Tim Allen’s Home Tim the Tool Man Taylor shows Bob Vila his Home Improvements at his home near Detroit. Including the demo to make room for ... |
 
|
|
Custom Door Installation Bob meets with Curt Weiss from J.W. Door who has made a custom door unit for the Los Angeles remodel, with glass lights ... |
 
|
|
Deck Demolition Bob and Ryley begin demo on the deck in the back of the house. The supporting beams are cut and the deck parts are carried ... |
 
|
|
Demolition and Framing a French Door Berky and the crew remove the old horsehair plaster in the existing 1890 kitchen. The framing and sheathing are original to ... |
 
|
|
Demolition and Reconstruction of Victorian Foundation Bob is with Tim Berky, the general contractor for the Rowley Victorian addition and kitchen remodel. He updates Bob on the ... |
 
|
|
Demolition in Action: Taking Down a Wall The demolition crew has removed all the old cabinets, fixtures, and electrical boxes in the kitchen before knocking down the ... |
 
|
|
Demolition in the Upstair Living Quarters Bob tours the upstairs at the governor's mansion restoration after the demolition is completed. |
 
|
|
Demolition of the Front Porch Contractor Bob Ryley discuss the front porch demolition. The existing farmer's porch will be removed, but first, Ryley checks ... |
 
|
|
Discussing a Controlled Demolition in a High-Rise Project Supervisor Dave Southard of DS Woodworks explains to Bob how a high-rise demolition differs from a single-family home ... |
 
|
|
Discussing Cedar Shingle Siding House seven of the Elmwood project. Homer Earl from the Cedar shake and shingle bureau tells us what makes a good shingle. ... |
 
|
|
Excavating and Building the Foundation Bob visits the start of the new foundation. The soil componants are discussed and the digging begins. Once the excavation is ... |
 
|
|
Exterior Demolition on the Victorian in Rowley, Massachusetts Tim Berky, the general contractor on the Victorian remodel in Rowley, Massachusetts, explains the sequence of exterior ... |
 
|
|
Federal-Style Home Restoration Update Bob meets with Richard Marks, general contractor at the Charleston, SC, remodel of a Federal-style home. Richard explains the ... |
 
|
|
First Floor Framing Bob reviews the construction layout of the first floor. The old kitchen was ripped out for a staircase to the second floor and ... |
 
|
|
Flooring, Plumbing, and Plastering The old flooring has been removed and Bob outlines the process of installing the new. LVL supports allow a restructuring of ... |
 
|
|
Framing Begins on the Miami Home Bob frames an exotic partition wall made to resemble a banana leaf in a Miami kitchen renovation. He also pours concrete to ... |