Home > How To Library > Floors > Wood Floor > Hardwood Flooring Installation Basics

Hardwood Flooring Installation Basics

Durable and elegant, plank floors come in varying lengths of prefinished hard wood or engineered boards.
Print VersionBookmarkEmail this page to a friend.

Related Showrooms

Lumber Liquidators - Hardwood Flooring for Less
Bellawood - Prefinished Hardwood Floors
Renovation Experts - Put your home in good hands. Get FREE estimates on your project.

   
   
   
Hardwood floors work anywhere in the home. In areas where they may see water and spills, regular maintenance will keep them looking like new for years.

Hardwood floors can be installed above or below grade, on concrete slabs, over plywood subfloors, or over existing wood floors. With concrete, moisture control is essential, but can be managed with a film barrier applied directly over the concrete. Engineered wood subfloors must be screwed or nailed in place prior to installation. Some manufacturers recommend proprietary underlayments that are specially suited to installation of their hardwood floors. Once the subfloor is in place, sanded, smoothed, or filled to provide a level, even surface, installation of the boards can begin. Whether you install the floor using a hammer
, a specialized board nailer or stapler, face nail the planks, or glue them to one another, the process of laying out the floor and marking for a square installation is the same.

Here are some tips and tricks for installing a hardwood floor:
     
    Most installers begin with the focal point of the room, such as a fireplace, when determining where to begin an installation. Here, border is installed around a bluestone hearth first. Laying decorative borders before the rest of the floor assures that the final installation will be symmetrical.
     
     
    Before laying the first board, snap a chalk line to use as a reference point. In this installation, a manufacturer's recommended underlayment is installed over the plywood subfloor.
     
     
    Aligning the first row of boards with the chalk line assures that all subsequent rows will be straight.
     
     
    Boards are often delivered in random lengths. Before securing the remaining boards to the subfloor, test fit the boards in sections. Test fitting the boards allows you to make sure that all of the points are staggered. As a rule of thumb, joints should be at least 12 inches apart.
     
     
    Blind nailing tongue-and-groove boards hides the fasteners. Each fastener is driven through one board's tongue, and covered by the next adjacent board. In other installations, nails are driven through the top of the board, a process called face nailing. Boards can also be glued down, and there are even types with adhesive strips on the back of the flooring.
     

© 2001 BobVila.com


Add To:
Del.icio.us
Digg
Google
Y! MyWeb
Reddit
Technorati

Find homes by zip code
Find home plans to suit your lifestyle


Intelligent Warmth - Today's Oilheat


PexSupply.com - PEX & Radiant Heat Supplies


Owens Corning - Basement Solution


ZN Custom Building - Modular Homes


KnobsandHardware.com - Decorative Hardware


Lumber Liquidators - Flooring

View all Showrooms


Related Articles Related Tips Related Videos
Choices for Floors: An Overview
Securing Wood Floors: Three Solutions
Reducing Radon in Your Drinking Water
Revive Hardwood Floor
Pre-Finished Wood Floors
Wood Floors and Light
Project Update: Model Home Tour
Data Security
Sanding Wood Floors







 

About | FAQ | Contact | Sitemap | Privacy Policy | Terms of Use | Help
© BobVila.com 2008