Step 5: Install the lower course of replacement shingles.
Using galvanized 8-penny nails, nail the first course of replacement shingles in place. Each shingle should be nailed in place with two nails. The nails should be on either side of the shingle and at least an inch from the edge.
Use two galvanized 8-penny nails per shingle.
|