|
|
|
 |
| Always use goggles when drilling and hammering. Be sure to wash hands after using lubricant. |
|
 |
|
|
|
 Click to enlarge + |
Step 1: Determine the cause of the squeaky floor Squeaky wooden floors can be caused by the movement between the individual floorboards, between the floorboards and the sub-flooring, or between the sub-flooring and the floor joists underneath. Determine the cause of the squeak and follow the appropriate steps.
Squeaking floors are a nuisance.
|
|
 Click to enlarge + |
Step 2: Use lubricant on squeaks caused by movement between floorboards To silence squeaking caused by movement between floorboards, lubricate the rubbing surface around the source of the noise with powdered graphite or talcum powder. Work the lubricant in by stepping on the section repeatedly until the squeaking is gone. Wipe away any excess lubricant.
Apply lubricant to the rubbing surface.
|
|
 Click to enlarge + |
Step 3: Refasten warped floorboards that have pulled away from the sub-flooring Squeaks can also be caused by movement between the floorboards and the sub-flooring. To refasten the floorboards, drill pilot holes into the face of the floorboard. Drill the holes a half an inch away from the edge of the board to avoid splitting.
Drill pilot holes into the face of the floorboard.
|
|
 Click to enlarge + |
Step 4: Drive nails into the pilot holes Use a hammer to drive 6-8d flooring nails into the pilot holes to press the flooring board firmly against the sub-flooring.
Hammer the nails through the pilot holes.
|
|
 Click to enlarge + |
Step 5: Set the nails and fill the holes Use a nail set to set the nails in place. Fill the holes with wood putty. Wipe away any excess putty.
Set the nails with a nail set.
|
|
 Click to enlarge + |
Step 6: For a better alternative to nails, use screws to refasten the floorboard to the sub-flooring Drill a pilot hole into the floorboard using a profile bit, which will allow the screw to set below the level of the floorboard. Be sure to check for any mechanical, plumbing, or electrical equipment in the area before drilling.
Use a profile bit to drill a pilot hole in the floorboard.
|
|
 Click to enlarge + |
Step 7: Drive the screw into the floorboard Use a screwdriver to drive the screw into the floorboard until it pulls the floorboard tight to the sub-floor.
The screw should set below the level of the floorboard.
|
|
 Click to enlarge + |
Step 8: Use a plug cutter to make a bung or a plug for the hole Use a plug cutter to drill a bung from a scrap of wood that is the same species as the floorboard. Pop the bung out with a screwdriver.
Drill the plug cutter into the scrap board to make a bung.
|
|
 Click to enlarge + |
Step 9: Insert the bung into the hole Cover the sides of the bung with wood glue. Press or lightly tap the bung into the hole. Be sure that the rough side of the bung is facing up and the grain is in line with the floorboard.
Position the bung in place.
|
|
 Click to enlarge + |
Step 10: Trim, sand, and stain the bung After the glue has dried, trim the excess bung material with a chisel if necessary. Lightly sand the bung to make the surface flush and smooth. Use a matching stain, gloss, or surface finish on the bung.
Sand the bung until it is flush and smooth.
|
|
 Click to enlarge + |
Step 11: Some squeaks are caused by friction between the sub-flooring and the floor joists If you have access to the underside of the floor, look for spaces between the sub-flooring and the joists that might be causing the squeaks.
Look for spaces between the sub-flooring and the joists.
|
|
 Click to enlarge + |
Step 12: Drive a shim between the sub-flooring and the joist Apply glue to the surface of a wooden shim. Drive the shim into the space between the sub-flooring and the joist.
Use a hammer to drive the shim into the space.
|
|
|