FOUNDATION & FRAMING: FOUNDATION
Browse By Tag
It’s not something you really want to acknowledge. You tell yourself it’s an optical illusion, or clutch to the conso...
Climate, including high water tables, frost lines, harsh winters, and vulnerability to storm surge and high winds, will determine whether a slab or below-grade fo...
Consider this advice before building on the foundation and embarking on the excavation.
An alternative to poured concrete, pre-case foundations have many benefits.
Bob introduces homeowner Howard Brickman. Steve Ivas, an environmental engineer, describes the area wetlands, which must be accommodated. Innovative building tech...
Todd LaBarge describes the ReddiForm block system used to create a one-step monolithic pour.
Bob and Howard discuss the concrete mesh used in the foundation that saved time and materials. Bob reviews the upcoming episode during which first floor walls ar...
Bob explores innovative construction technologies – Insul-Tarp and ReddiForm polystyrene blocks – as the structure is reinforced and the first-floor walls start t...
Bob meets with Jim Costello from Superior Walls of America to discuss the difference between a pre-cast and a traditional poured-concrete foundation.
Chris Vila discusses the benefits of a factory-built foundation system with Mel Zimmerman of Superior Walls.
Bob and contractor Paul Morse review the excavations and formwork for the foundation.
Bob meets with the contractor to inspect the poured footings and discuss the pouring process. Next, Bob helps install the sill plate and explains the various type...
The foundation has been hand-dug and the forms laid for the footings. Bob and contractor Bob Ryley discuss the layout of the greenhouse foundation and framing.
The structural steel supports are delivered and while Bob discusses the supports' unique construction, contractor Bob Ryley drills the necessary holes for the sup...
Bob discusses a new foundation system that doesn't require a concrete truck being on site.
The basement walls are lifted into place and secured. This system is ideal for cold weather installation as the concrete is already cured before delivery. The pre...
To provide structural support in the new Malibu beach house, holes are dug in the beach and the new cement caissons are poured.
Bob pays a visit to the site as work on the foundation gets underway. Once the excavation is complete, the forms (for the poured concrete) are assembled and put i...
Bob meets with Lars Anderson (from Owens Corning) to discuss the Lite-Form Insulating System used in the garage's foundation. The forms are pre-assembled and tied...
Bob and contractor Bob Ryley discuss the pouring of concrete into Styrofoam forms for the foundation. The mix is slightly more liquid than most. While the increas...
Bob meets with contractor John Clancy to discuss building the concrete block foundation.
Bob meets with the architect to go over plans for the Cape-style house, before heading to the site to observe the pouring of the foundation.
General contractor Tim Berky updates Bob on progress since the footing for the new foundation was poured and repairs to the original foundation were made.
Bob joins general contractor Tim Berky to hear how the foundation and footing will be handled for the Victorian kitchen remodel and deck addition.