We also have some wires and pipes running on the trusses and need to floor around these.
3 walls are load bearing and the trusses run from one load bearing wall to the non-load bearng wall (one double wide garage door).
We also have some wires and pipes running on the trusses and need to floor around these.
3 walls are load bearing and the trusses run from one load bearing wall to the non-load bearng wall (one double wide garage door).