I heard from a couple craftsmen that the plastics should go between the cement and studs keeping the studs moisture free...
Other craftsmen says between the drywall and studs..
I don't plan on using treated studs on the walls..
What is correct way?
I heard from a couple craftsmen that the plastics should go between the cement and studs keeping the studs moisture free...
Other craftsmen says between the drywall and studs..
I don't plan on using treated studs on the walls..
What is correct way?
To test, place a few squares of plastic on the conrete walls hither and yonder with duct tape sealing the edges. Leave in olace for a cpouple days and then see if you have water condesed under the plastic, between it and the crete. If so, you need to waterproof the exteriior