The Dean of Home Renovation & Repair Advice

COMMUNITY FORUM

bgiovan

05:34PM | 07/08/04
Member Since: 07/07/04
1 lifetime posts
Bvmisc
Converting a sun room into a 4 seasons room and want to tile surface. Existing slab is out of level as much as one inch at the edges. Experienced heart failure over the cost of a bag of self-level and am curious if I can pour concrete over existing slab to bring to almost level and finish with the self leveler if necessary. Thanks in advance for help!

PS, house is in Detroit and porch may not be heated 24/7. Thanks!


Post a reply as Anonymous

Photo must be in JPG, GIF or PNG format and less than 5MB.

Reply_choose_button

captcha
type the code from the image

Anonymous

Post_new_button or Login_button
Register

Follow Us

horizontal divider
facebook
 
webapp1