COMMUNITY FORUM

AndrewB

07:18AM | 03/29/01
Member Since: 03/28/01
1 lifetime posts
Bvroofing
After completing the plywood on the roof, what type of tape strip should be put down over the plywood seams to eliminate water leaks?

david_wv

01:52AM | 03/30/01
Member Since: 01/28/01
171 lifetime posts
The standard is to cover all the plywood with tar paper. Start at the bottom, lay across the slope and overlap by 3 to 4 inches. You need to keep water off the plywood since wet wood won't dry under the shingles, it will rot. Usually 1/4" or so gaps are left open between sheets of plywood to account for temperature and humdity expansion, and any settling of the roof. You don't want the plywood binding and pulling away from the rafters.


Post a reply as Anonymous

Photo must be in JPG, GIF or PNG format and less than 5MB.

Reply_choose_button

captcha
type the code from the image

Anonymous

Post_new_button or Login_button
Register

Follow Us

horizontal divider
facebook
 
webapp2