Pouring a Concrete Floor

Project: Kitchen Remodel, Episode 6, Part 1



Bob and contractor Ed Weller take on the tricky process of tying together the old and new floor slabs. Work begins on the new family room partition that will take the unique shape of a banana leaf. To make sure the new space stays cool, an HVAC unit and roof insulation are installed.
Part 1: Pouring a Concrete Floor
Bob watches a strip of concrete being poured between two existing slabs. Rebar is placed in the existing slabs to prevent cracking, and a joining compound is added to ensure proper adhesion.
Part 2: Framing a Partition Wall
Part 3: HVAC System for the Home Addition

MOST POPULAR CLIPS

OUTDOOR PROJECTS

HOUSE & GARDEN TOURS