Drywall Installation
Bob tours the interior, looking at the finished drywall and insulation. In the living room, a new Shaw pre-finished hardwood floor is being put down. David LaFosse (from LaFosse & Co.) is on hand to talk to Bob about the process. In the kitchen Ryley and Pat Cloutier are busy putting up trim around the windows.
- Part 1: Drywall Installation
- Bob walks through the farmhouse interior, now that the drywall is complete, and points out some of the challenges the home's design posed for the drywall contractors.
In a flashback, we watch the drywall job in progress. The contractors begin with the most difficult element, where the valley of the roof is virtually built into the room, then finish up with large pieces of drywall on the ceiling and walls. - Part 2: Hard Maple Flooring Installation
- Part 3: Trimming Out Double-Hung Windows
The wooded New England setting, with quaint towns and covered bridges, provides the perfect backdrop for building a traditional Vermont-style farmhouse.
Bob works with the Quechee Lakes Development Company to build a residence that hearkens back to the past yet satisfies the needs of a family in the new millennium.
Bob works with the Quechee Lakes Development Company to build a residence that hearkens back to the past yet satisfies the needs of a family in the new millennium.
Also from Vermont Farmhouse
-
Episode 4 - Framing and Wiring for the Future
-
Episode 5 - Exterior Update
Description:
Bob tours the exterior of the farmhouse project in Quechee, VT, where windows have been installed, Weyerhaeuser siding has gone up, and the roof framing has been finished. Also, there is a new bulkhead door.<br> <br> Installation of the home's standing seam metal roof is also underway. Pat Cloutier (from Cloutier Construction) is on-site putting down some Georgia-Pacific redwood decking. And Bob Ryley is on board to help Pat trim out some columns on the back porch with WindsorONE engineered lumber.<br> <br> Bob takes a trip to the Cobb Hill Co-Housing Community to learn about some of the farming techniques being practiced. -
Episode 7 - Exterior Painting and Kitchen Cabinet Installation
Description:
Painting is getting started on the exterior of the house. Bob is shown the techniques being used to paint the front façade, and custom cabinets from Crown Point Cabinetry are ready to go in the kitchen. Ryley and Pat Cloutier will install the cabinets, but first, Bob takes us on a tour of the Crown Point factory in Claremont, NH to see what goes into their construction. -
Episode 8 - Finish Trim and Cabinet Installation
-
Episode 9 - Stone Wall Construction and Covered Bridges
-
Episode 10 - Connected Home Update and Garage Doors
-
Episode 11 - Kitchen Update and Bathroom Tile Installation
-
Episode 12 - Home Entertainment and Carpet Installation
-
Episode 13 - Project Completion
More From This Episode
MOST POPULAR
MOST SHARED
MOST VIEWED VIDEO
Follow Us