Installing Crown Point Kitchen Cabinets
Painting is getting started on the exterior of the house. Bob is shown the techniques being used to paint the front façade, and custom cabinets from Crown Point Cabinetry are ready to go in the kitchen. Ryley and Pat Cloutier will install the cabinets, but first, Bob takes us on a tour of the Crown Point factory in Claremont, NH to see what goes into their construction.
- Part 1: Exterior Painting With an Airless Sprayer
- Part 2: Crown Point Cabinet Factory Tour
- Part 3: Installing Crown Point Kitchen Cabinets
- Carpenters Bob Ryley and Pat Cloutier are installing the Crown Point cabinets in the kitchen. The first step is to unpack the cabinets and spread them out, and eyeball where they are going to go. Next, the carpenters establish where the top cabinet will be placed.
In this instance, the top line is dictated by the height of the refrigerator cabinet-- 90 inches. Pat and Ryley check the top line for plumb, locate the studs, pre-drill holes inside the cabinets to line up exactly with the studs, lift the cabinets into place, and support them temporarily with deadmen, while they fasten them to the wall.
Next, Bob helps position the corner cabinet. To ensure that the stiles of the other base cabinets that are stacked next to each other are flush and tight, Pat uses a cabinet clamp. One part of the clamp brings the two stiles together, another makes sure they are flush, and then a hole precisely positioned in the clamp allows Pat to pre-drill right through the middle of the stiles and screw the cabinets together.
The wooded New England setting, with quaint towns and covered bridges, provides the perfect backdrop for building a traditional Vermont-style farmhouse.
Bob works with the Quechee Lakes Development Company to build a residence that hearkens back to the past yet satisfies the needs of a family in the new millennium.
Bob works with the Quechee Lakes Development Company to build a residence that hearkens back to the past yet satisfies the needs of a family in the new millennium.
Also from Vermont Farmhouse
-
Episode 4 - Framing and Wiring for the Future
-
Episode 5 - Exterior Update
Description:
Bob tours the exterior of the farmhouse project in Quechee, VT, where windows have been installed, Weyerhaeuser siding has gone up, and the roof framing has been finished. Also, there is a new bulkhead door.<br> <br> Installation of the home's standing seam metal roof is also underway. Pat Cloutier (from Cloutier Construction) is on-site putting down some Georgia-Pacific redwood decking. And Bob Ryley is on board to help Pat trim out some columns on the back porch with WindsorONE engineered lumber.<br> <br> Bob takes a trip to the Cobb Hill Co-Housing Community to learn about some of the farming techniques being practiced. -
Episode 6 - Flooring and Interior Trim
Description:
Bob tours the interior, looking at the finished drywall and insulation. In the living room, a new Shaw pre-finished hardwood floor is being put down. David LaFosse (from LaFosse & Co.) is on hand to talk to Bob about the process. In the kitchen Ryley and Pat Cloutier are busy putting up trim around the windows. -
Episode 8 - Finish Trim and Cabinet Installation
-
Episode 9 - Stone Wall Construction and Covered Bridges
-
Episode 10 - Connected Home Update and Garage Doors
-
Episode 11 - Kitchen Update and Bathroom Tile Installation
-
Episode 12 - Home Entertainment and Carpet Installation
-
Episode 13 - Project Completion
MOST POPULAR
MOST SHARED
MOST VIEWED VIDEO
Follow Us