- Bob Vila TV Shows >
- Victorian Restoration > Episode 5: Roof Work and Lighting
HVAC System Installation
The barn's roof system gets a makeover. First, LP sheathing forms the new roof deck, then Owens Corning shingles and Velux skylights are installed. Inside the barn, a space-saving high-velocity air-conditioning system from SpacePak is being retrofitted on both floors.
At the main house, Charlie Tomaszewski and crew are making repairs to the decorative dentilation, as well as working on the shingles and a new gutter system. Inside, electrician Barry Driscoll is putting in new recessed light fixtures from Lightolier.
At the main house, Charlie Tomaszewski and crew are making repairs to the decorative dentilation, as well as working on the shingles and a new gutter system. Inside, electrician Barry Driscoll is putting in new recessed light fixtures from Lightolier.
- Part 1: HVAC System Installation
- Bob joins Paul Costello and Lou Mazzini in the barn to discuss the SpacePak high-velocity hydro-air HVAC system that's being installed in both the house and barn. The system will provide heating and cooling.
In the winter, a boiler delivers hot water to coils, over which air is drawn. This heated air rises and is distributed at high velocity through plenum ducts.
Cooling is accomplished by the same system, only the air passes over different coils that are cooled by refrigerants from 5-ton American Standard condensers situated behind the building.
Domestic hot water will be provided by a very efficient indirect hot water system. The SpacePak system is particularly well-suited to restoration/renovation projects where space for ductwork is at a premium. - Part 2: Installing Architectural Shingles and Skylight
- Part 3: Installing Recessed Lighting Fixtures
- Part 4: Decorative Trim and Removing or Repairing Old Shingles
Located just five miles from downtown Boston, Bob's scouts discovered a Victorian-era house in a neighborhood of family homes on tree-lined streets that was past due for a full-scale renovation.
The home's new owners, a work-at-home family, have set goals to modernize the home's floor plan, update the building's mechanical and electrical systems, and add home office and work spaces for two busy professionals.
The home's new owners, a work-at-home family, have set goals to modernize the home's floor plan, update the building's mechanical and electrical systems, and add home office and work spaces for two busy professionals.
Also from Victorian Restoration
-
Episode 1 - Initial Tour
Description:
This ambitious restoration project involves renovating a Victorian home, as well as a former dairy barn also on the property. In its new configuration, the barn will include two offices and an art studio. After a brief tour of the city, Bob meets with the home's new owner, Rikk Larsen, and contractor Charlie Tomaszewski, to discuss the work ahead. -
Episode 3 - Moving the Entrance and Kitchen Layout
Description:
Contractor Charlie Tomaszewski and crew are hard at work moving the front door of the main house to accommodate a new entranceway. In addition, Tomaszewski is using an air-driven palm nailer to finish up work on new support beams.<br> <br> Bob meets homeowner Julie Graham, who is working with Faith Allen from Merillat to create the new kitchen layout. Across town, Bob tours the Isaac Royall House. -
Episode 4 - Electrical Systems and Wiring and Upstairs Framing
Description:
Bob gets an update on the progress taking place at the Victorian renovation project. Rough electrical work is underway, as is the home's data and video wiring, which will form the backbone for the advanced communications, security, and entertainment systems. Workers are framing a new addition, and are also at work on the second floor, where a Kohler tub and new Pella windows are being installed. -
Episode 6 - Skylight Installation, Roofing, and Painting
-
Episode 7 - Barn Insulation, Video Wiring, and a New Balcony
-
Episode 8 - Blueboard Installation, Landscaping, and a New Garage Door
-
Episode 9 - Work on the Driveway and Finishing the Deck
-
Episode 10 - Flooring, Glass-Block Walls and Floors, and Water Filtration
-
Episode 11 - Landscaping Begins, Flooring Continues, and Water Heater Installed
-
Episode 12 - Cabinets, Countertops, and Closets
-
Episode 13 - Final House Tour
MOST POPULAR
MOST SHARED
MOST VIEWED VIDEO
Follow Us




















