- Victorian Restoration > Episode 8: Blueboard Installation, Landscaping, and a New Garage Door
Garage Door Installation
Bob talks with Bill Reid (from US Gypsum) about the differences between blue board and the drywall. In the backyard, Bob meets with Fred Goode (from BrattleWorks) to talk about the special landscape fencing being put in. (Then they take a tour of the nearby factory to see how the fencing is made). Finally, a new Clopay garage door is installed.
- Part 1: Drywall vs. Blueboard Explained
- Part 2: Trellis and Lattice Fencing & Workshop Tour
- Part 3: Installing Drywall with Wallboard and Taped Joints
- Part 4: Garage Door Installation
- The new six-panel garage door (made of hemlock) undergoes installation. Windows on the top part of the door not only admit light into the garage, but also mimic the look of the original barn doors.
Located just five miles from downtown Boston, Bob's scouts discovered a Victorian-era house in a neighborhood of family homes on tree-lined streets that was past due for a full-scale renovation.
The home's new owners, a work-at-home family, have set goals to modernize the home's floor plan, update the building's mechanical and electrical systems, and add home office and work spaces for two busy professionals.
The home's new owners, a work-at-home family, have set goals to modernize the home's floor plan, update the building's mechanical and electrical systems, and add home office and work spaces for two busy professionals.
Also from Victorian Restoration
-
Episode 1 - Initial Tour
Description:
This ambitious restoration project involves renovating a Victorian home, as well as a former dairy barn also on the property. In its new configuration, the barn will include two offices and an art studio. After a brief tour of the city, Bob meets with the home's new owner, Rikk Larsen, and contractor Charlie Tomaszewski, to discuss the work ahead. -
Episode 3 - Moving the Entrance and Kitchen Layout
Description:
Contractor Charlie Tomaszewski and crew are hard at work moving the front door of the main house to accommodate a new entranceway. In addition, Tomaszewski is using an air-driven palm nailer to finish up work on new support beams.<br> <br> Bob meets homeowner Julie Graham, who is working with Faith Allen from Merillat to create the new kitchen layout. Across town, Bob tours the Isaac Royall House. -
Episode 4 - Electrical Systems and Wiring and Upstairs Framing
Description:
Bob gets an update on the progress taking place at the Victorian renovation project. Rough electrical work is underway, as is the home's data and video wiring, which will form the backbone for the advanced communications, security, and entertainment systems. Workers are framing a new addition, and are also at work on the second floor, where a Kohler tub and new Pella windows are being installed. -
Episode 5 - Roof Work and Lighting
-
Episode 6 - Skylight Installation, Roofing, and Painting
-
Episode 7 - Barn Insulation, Video Wiring, and a New Balcony
-
Episode 9 - Work on the Driveway and Finishing the Deck
-
Episode 10 - Flooring, Glass-Block Walls and Floors, and Water Filtration
-
Episode 11 - Landscaping Begins, Flooring Continues, and Water Heater Installed
-
Episode 12 - Cabinets, Countertops, and Closets
-
Episode 13 - Final House Tour
MOST POPULAR
MOST SHARED
MOST VIEWED VIDEO
Follow Us