- Bob Vila TV Shows >
- Victorian Restoration > Episode 10: Flooring, Glass-Block Walls and Floors, and Water Filtration
Installing Wood Laminate Flooring
Bob talks to Fred Giuggio (from Quick-Step) about the new interlocking laminate floor system being installed. In the master bathroom, a glass block wall is being constructed along one wall of the shower. It's been designed to allow light into the room, while still providing privacy. Also, general contractor Charlie Tomaszewski installs a unique glass block floor system from Circle Redmont. In the basement, a new water filtration system is going in, and Bob talks with Dave Krupinski from Kinetico about the process.
- Part 1: Installing Wood Laminate Flooring
- Bob meets with Fred Giuggio (from QuickStep) whose crew is installing wood laminate flooring. QuickStep is a glueless flooring. It's engineered using 8-millimeter board. The boards just click together on all four sides. The product has a 25-year stain, fade, wear, and moisture warranty, and comes in 25 different colors, including the 'bianco' selected for the barn/studio.
The crew puts the QuickStep Unisound 1/16 sound attenuating floating pad on top of the concrete slab and lays the QuickStep on top of that. It's quick and easy to install and, since it uses no glue, post-installation cleanup is a breeze.
During installation, spacers are placed around the perimeter allowing 1/4-inch for expansion. Boards are staggered to prevent joints from lining up. A board is locked in on one side, positioned as close as possible to the next locked-in board, then tapped from the end to secure the mechanism. If a board is damaged, it can be easily removed and replaced.
The product can be cut with a crosscut saw for installation around columns, etc., and it cleans with a dry mop. - Part 2: Glass Block Floor Panel System
- Part 3: Kinetico Water Filtration System Installation
- Part 4: Update on Deck, Breezeway, and Barn/Studio
Located just five miles from downtown Boston, Bob's scouts discovered a Victorian-era house in a neighborhood of family homes on tree-lined streets that was past due for a full-scale renovation.
The home's new owners, a work-at-home family, have set goals to modernize the home's floor plan, update the building's mechanical and electrical systems, and add home office and work spaces for two busy professionals.
The home's new owners, a work-at-home family, have set goals to modernize the home's floor plan, update the building's mechanical and electrical systems, and add home office and work spaces for two busy professionals.
Also from Victorian Restoration
-
Episode 1 - Initial Tour
Description:
This ambitious restoration project involves renovating a Victorian home, as well as a former dairy barn also on the property. In its new configuration, the barn will include two offices and an art studio. After a brief tour of the city, Bob meets with the home's new owner, Rikk Larsen, and contractor Charlie Tomaszewski, to discuss the work ahead. -
Episode 3 - Moving the Entrance and Kitchen Layout
Description:
Contractor Charlie Tomaszewski and crew are hard at work moving the front door of the main house to accommodate a new entranceway. In addition, Tomaszewski is using an air-driven palm nailer to finish up work on new support beams.<br> <br> Bob meets homeowner Julie Graham, who is working with Faith Allen from Merillat to create the new kitchen layout. Across town, Bob tours the Isaac Royall House. -
Episode 4 - Electrical Systems and Wiring and Upstairs Framing
Description:
Bob gets an update on the progress taking place at the Victorian renovation project. Rough electrical work is underway, as is the home's data and video wiring, which will form the backbone for the advanced communications, security, and entertainment systems. Workers are framing a new addition, and are also at work on the second floor, where a Kohler tub and new Pella windows are being installed. -
Episode 5 - Roof Work and Lighting
-
Episode 6 - Skylight Installation, Roofing, and Painting
-
Episode 7 - Barn Insulation, Video Wiring, and a New Balcony
-
Episode 8 - Blueboard Installation, Landscaping, and a New Garage Door
-
Episode 9 - Work on the Driveway and Finishing the Deck
-
Episode 11 - Landscaping Begins, Flooring Continues, and Water Heater Installed
-
Episode 12 - Cabinets, Countertops, and Closets
-
Episode 13 - Final House Tour
MOST POPULAR
MOST SHARED
MOST VIEWED VIDEO
Follow Us




















