- Bob Vila TV Shows >
- Accessible Home > Episode 6: Building the Railing System
Building a Porch Railing
Carpenter Bob Ryley and George (from Crosswinds Enterprises) build a railing system of pressure-treated lumber and integrate it with the front porch columns.
Bob takes a tour of some of the grand old houses left over from Roxbury's heyday at the turn of the century. After a period of serious urban blight, this once-grand Boston community is making a dramatic comeback.
Back at the site, a few of the housing units have already been plastered, and some windows have been given custom sills.
Bob takes a tour of some of the grand old houses left over from Roxbury's heyday at the turn of the century. After a period of serious urban blight, this once-grand Boston community is making a dramatic comeback.
Back at the site, a few of the housing units have already been plastered, and some windows have been given custom sills.
- Part 1: Building a Porch Railing
- Carpenter Bob Ryley and George (from Crosswinds Enterprises) collaborate to build a porch railing for the accessible home. Looking on, Bob discusses the building codes that pertain to the rail and the materials used.
- Part 2: Tour of Historic Roxbury Architecture
- Part 3: Installing Custom Window Sills
This project follows an urban renewal story, involving grass-roots activism and affordable housing. Bob Vila reports on nine newly built three-bedroom homes, including one with accessibility for people with disabilities.
Also from Accessible Home
-
Episode 1 - Housing Project Introduced
Description:
Bob introduces the nine-unit affordable housing project in Roxbury, MA, by touring the neighborhood with the community-based developers from Nuestra Comunidad CDC.<br> <br> Bob shows that here, as is often the case in urban construction projects, soil decontamination is taking place at the same time as foundation excavation.<br> <br> At another site, we meet Arnold Johnson and George Chin, contractors for the accessible hour the job, who show Bob around a unit that's already been framed. -
Episode 2 - Framing and Shingling
Description:
Framing is underway on the unit of the Roxbury project that will be accessible for people with disabilities.<br> <br> George and Arnold (from Crosswinds Enterprises) explain the panelization process and what it takes to get the job done right with a building crew that's as culturally diverse as the community.<br> <br> On the roof, Jack Vieira installs asphalt shingles and flashing, while George installs special blocking inside that will be used to securely mount some safety handrails. -
Episode 3 - Installing Siding
-
Episode 4 - Insulation and Door Installation
-
Episode 5 - Designing for the Disabled
-
Episode 7 - Landscaping and Stairs
-
Episode 8 - Installing a Tankless Water Heater
-
Episode 9 - Shower Stall and Drywall
-
Episode 10 - Accessible Fixtures and Elevator
-
Episode 11 - Energy Efficiency
-
Episode 12 - Lockset Installation
-
Episode 13 - Accessible Unit Tour
More From This Episode
MOST POPULAR
MOST SHARED
MOST VIEWED VIDEO
Follow Us




















