- Bob Vila TV Shows >
- Dream Garage and Boat Storage > Episode 7: Exterior Trim and Siding
Working With Exterior Trim
Project: Dream Garage and Boat Storage, Episode 7, Part 2
After a quick progress report on the insideof the barn, Bob and carpenter Bob Ryley install a new Pella window and trim it out. Also, exterior trim work and siding are underway.
Bob takes a tour of the American Plywood Association laboratory in Seattle, WA to see how these products are tested for quality and consistency.
Bob takes a tour of the American Plywood Association laboratory in Seattle, WA to see how these products are tested for quality and consistency.
- Part 1: Vinyl Window Installation
- Part 2: Working With Exterior Trim
- Bob and contractor Bob Ryley create an overhang detail with eyebrow returns and cedar plywood siding.
- Part 3: Plywood Testing Facilities Tour
This innovative and functional post-and-beam barn structure is designed to provide space to store, and perform work on, boats and cars. Bob Vila takes us through the story,which centers around creating a state-of-the-art, ergonomically efficient, well-lit, and safe environment.
ALL EPISODES IN DREAM GARAGE AND BOAT STORAGE