Wiring the Cabin
Construction continues on the cabin in the woods. Electrical and plumbing work has been approach simplistically and the materials creatively chosen. Also, Bob tours the mother of all cabins, Great Camp Sagamore.
- Part 1: Exterior Tour and Plumbing
- Part 2: Tour of the Vanderbilts' Great Camp Sagamore
- Part 3: Wiring the Cabin
- Bob and the electrician look over the plastic-sheathed electrical wiring and discuss how to protect the installation, while still making it look good.
Bob Vila explores the concept of sustainable design by putting resource management theories into practice for everyday living. Projects include a pre-cast foundation system, earth-friendly septic system, energy-efficient appliances, and more.
Also from Cabin in the Woods
-
Episode 1 - Foundation, Framing, and Septic System
Description:
Bob begins this project in a woodsy setting, and, alongside contractor Bob Ryley, discusses plans for the tiny, romantic weekend getaway cottage to be built on the site. The crew gets started right away with the new pre-cast foundation system from Superior Walls of America. The latest in streamlined septic system is installed the same day, and the crew gets started framing the first floor deck. -
Episode 2 - Framing the Cabin
-
Episode 3 - Framing and Chimney
-
Episode 4 - Installing Skylights and Framing the Staircase
-
Episode 5 - Installing Windows and Doors
-
Episode 7 - Interior Finishes
-
Episode 8 - Installing the Kitchen and Patio
-
Episode 9 - Cabin Tour