Reviewing the Landscape

Project: Split-Level Ranch, Episode 4, Part 3



Bob must deal with an overloaded septic system by replacing the old clogged tank and leach field. Since the bathroom has already been gutted, plumbers begin to install new fixtures. Contractor Bob Ryley demonstrates how to install a 48-pane window in the front addition. Bob also consults with a landscape architect, who shares ideas about dressing up the yard.
Part 1: Replacing the Septic System
Part 2: Installing New Bathroom Fixtures
Part 3: Reviewing the Landscape
Bob meets with a landscaper to discuss the existing plantings, some of which will be removed or cut back to maximize the amount of interior light. Trees, shrubs, and a trellis are recommended to create a barrier between the yard and the road.

MOST POPULAR CLIPS

OUTDOOR PROJECTS

HOUSE & GARDEN TOURS