- Bob Vila TV Shows >
- Two-Family Greystone > Episode 7: Plumbing Continues
Replacing the Toilet
Bob goes downtown to the Merchandise Mart to see a selection of bathroom fixtures at K & B Galleries with Susan Kaiser. Back at the greystone project, plumber Dan Macias replaces an old toilet with a new, high-efficiency toilet. General contractor Ron Gan talks about 'bricking in' for and installation of a smaller bathroom window.
- Part 1: Bricking In a Window
- Part 2: The Merchandise Mart
- Part 3: Replacing the Toilet
- Plumber Dan Macias replaces the old toilet with a new, high-efficiency model.
Bob Vila tracks the progress of a two-family greystone in Chicago's Wicker Park neighborhood that is undergoing renovation. The project documents a low-budget upgrade of the building's two apartments and concludes with a decorator's tour showcasing the eye-catching results.
Also from Two-Family Greystone
-
Episode 1 - House and Neighborhood Tour
-
Episode 2 - Plans Discussed and Demolition Begins
-
Episode 3 - Engineered Beams and Plumbing
Description:
Bob and general contractor Ron Gan discuss the removal and shoring up of bearing walls, which are to be replaced by special engineered beams. Bob visits David Parker at Macmillan-Bloedel's Parallam Plant in Vancouver, BC to see how those beams are manufactured. Also, plumber Don McPoland shows us how the new water service is connected to the house. -
Episode 4 - Parallam and Iron Board
-
Episode 5 - Basement Excavation Begins
-
Episode 6 - Electrical Work Begins
-
Episode 8 - Plaster and Drywall Work
-
Episode 9 - Budgeting and Tiling
-
Episode 10 - Lighting and Flooring
-
Episode 11 - Landscaping Begins
-
Episode 12 - Flooring and Stairs
-
Episode 13 - House Tour
More From This Episode
MOST POPULAR
MOST SHARED
MOST VIEWED VIDEO
Follow Us




















