- Bob Vila TV Shows >
- Waterfront Warehouse Rehab > Episode 7: Rooftop Work and Wood Floor Installation
Installing Hardwood Flooring
On the roof, Bob and Chris Vila discuss the cooling units with HVAC contractor Isaac Chazbani. At the same time, welder Jimmy Canka installing an iron safety railing and glazier Alan Chi installs glass windows and doors in the roof deck entryway.
Next, Bob and John Sodano, the plumbing contractor, discuss the placement of the boiler. Bob then goes indoors to review installation of the Bellawood hardwood flooring with Stephen Shelowitz (Williamsburg Parquet Flooring). Shelowitz explains the finer points of Bellawood's flooring product. He details how the factory-applied finish is tested and how his crew installs the flooring.
Next, Bob and John Sodano, the plumbing contractor, discuss the placement of the boiler. Bob then goes indoors to review installation of the Bellawood hardwood flooring with Stephen Shelowitz (Williamsburg Parquet Flooring). Shelowitz explains the finer points of Bellawood's flooring product. He details how the factory-applied finish is tested and how his crew installs the flooring.
- Part 1: Safety Railing Installation
- Part 2: Privacy Glass Installation
- Part 3: Installing Hardwood Flooring
- Bob joins Steve Shelowitz from Williamsburg Parquet Flooring to observe the installation of hardwood floors in the penthouse apartment. Before the floor is secured, a red rosin paper is laid over the subfloor. The underlayment prevents dust from traveling between the subfloor and the finished floor, and prevents wood-to-wood contact, reducing the possibility of squeaking. The Ash hardwood floors are first roughed into place to determine the layout. Joints are staggered for an attractive layout, and longer boards are placed in the room's most visible areas. The floor's finish is factory applied, and is guaranteed for 50 years of normal residential use.
Bob Vila heads to the DUMBO neighborhood of Brooklyn, NY, for this project involving an abandoned warehouse built in the mid-19th century. Bob's adaptive reuse will yield three ultra-hip apartments with commercial space at street level. Project manager is Bob's oldest son, Chris Vila, who helps guide this complete rehabilitation of a beat-up building in the city that never sleeps.
Also from Waterfront Warehouse Rehab
-
Episode 1 - Welcome to Brooklyn!
Description:
Bob begins a project in Brooklyn, New York, in an area known as "DUMBO", or Down Under the Manhattan Bridge Overpass. With beautiful downtown Manhattan in the background, Bob delivers a brief history of Brooklyn's waterfront area. Next, he joins his son, Chris Vila, who is manager of the project, to discuss what's in store. Slated for three floors of residential space, the building will reserve its ground floor for commercial use. Jared Della Valle and Andrew Bernheimer chat with Chris about possible floor plans, while Bob talks with Jacker Beyer, of Beyer Blinder Belle, about restoring the façade. -
Episode 2 - Demolition and Preservation in Brooklyn
Description:
Bob and his son Chris tour a loft space in the nearby Sweeney Building. On top of stunning views of the Brooklyn Bridge and downtown Manhattan, the building boasts a "tar beach" rooftop deck.<br> <br> David and Jed Walentas of Two Trees Development communicate their vision for the area. Back on site, demolition is underway and preservation expert Bill Higgins, of Higgins and Quasebarth, tells us more about the history of the building. -
Episode 3 - Interior Demolition, Water Taxi Tour, and Framing With Metal Studs
Description:
Interior work and demolition are progressing simultaneously. Bob and his son, the project manager Chris Vila, review three weeks' worth of progress. Work performed to date includes removing an old elevator shaft and sandblasting exposed wood and brick surfaces. A new tongue and groove plywood subfloor is being installed and basic wall framing has begun. Also, Bob takes us on a water taxi tour to learn more about the history of heavy industry along Brooklyn's waterfront. -
Episode 4 - Brick Façade Restoration and Window Installation
-
Episode 5 - Electrical Work, Navy Yard Tour, and Insulation Install
-
Episode 6 - Interior Construction and Skylight Install
-
Episode 8 - Marble Tile, Cherry Cabinets, and the Brooklyn Academy of Music
-
Episode 9 - Stone Countertop Installation and Interior Trimwork
-
Episode 10 - Noise Reduction and Security
-
Episode 11 - Roof Deck and High-Tech Bathroom Features
-
Episode 12 - Penthouse Interior Design
-
Episode 13 - Brooklyn Project Wrap-Up
More From This Episode
MOST POPULAR
MOST SHARED
MOST VIEWED VIDEO
Follow Us




















