Preparing a Shower Pan for Tumbled Stone Tile Installation

Project: Lifespan House, Episode 8, Part 2



Traditional shutters are going up on the front porch, and there is work being done to the porch ceiling, railing, and trim.

In the bathroom, tile work begins, featuring the installation of a tumbled marble shower, surrounded by stenciled design. Also, the granite vanity top for the Kohler lavatory is cut.

Around back, carpenter Bob Ryley and general contractor Kevin Kalman are making progress on the side porch. Additional information is available regarding historic paint colors in the Charleston area.
Part 1: Finishing the Front Porch and Installing Custom Pine Shutters
Part 2: Preparing a Shower Pan for Tumbled Stone Tile Installation
Bob observes the tile setter Tim Galvin build a shower pan, the purpose of which is to protect the surrounding area from moisture. Then, Tim applies mortar on top of the pan, before setting the tile in place.
Part 3: Laying Plywood for the Front Porch Ceiling
Part 4: Limestone Tile Installation
Bob Vila heads to the Low Country: Mount Pleasant, South Carolina. Steeped in tradition, this historic suburb of Charleston is the scene, not only of a remarkable new home, but of a remarkable transformation in suburban living at the developing community of I'On.

Also from Lifespan House

  • Episode 1 - New Project Begins

    I'on-mount-pleasant

    Description:
    Bob begins a brand-new project in the heart of South Carolina's low country. Located in Mt. Pleasant, the neighborhood of I'On values community living and puts an emphasis on nurturing a traditional small-town feeling.<br> <br> Our project, the Duany Plater-Zybek "Lifespan" home, is designed with state-of-the-art features, and its construction has been planned around new building techniques developed to make the house more resistant to extreme weather.<br> <br> Bob tours the coastal town of Mt. Pleasant and meets the contractor, Kevin Kalman, and other I'On developers to discuss building strategies and techniques.<br> <br> Work has begun on the first floor deck, and Steve Barth from Willamette Industries is on-hand to explain the EZ Frame system being used. Additional information is available regarding the benefits of building with engineered wood.
  • Episode 2 - Working on the First Floor

    Carpenter-bob-ryley

    Description:
    Carpenter Bob Ryley joins joins to continue work on the first floor. First, Bob looks at the tongue-and-groove decking system, before moving on to framing the first-floor walls.<br> <br> In downtown Charleston, Bob Vila visits the Clemson University high-wind test house, built to demonstrate the newest building techniques for hurricane resistance.<br> <br> Back on site, Bryan Readling (from the APA) discusses which techniques are being used in the Mount Pleasant project. Additional information is available regarding constructing and retrofitting homes to withstand hurricanes, installing structural adhesives, storm shutters, and tips for a better roof.
  • Episode 3 - Framing the Roof

    Roofing

    Description:
    Bob walks the I'On neighborhood, which is built around myriad architectural styles and designs. He remarks on some of these variations, before returning to the project house site, where the roof framing is underway.<br> <br> Bryan Readling (from the APA) joins to review the products being used on the roof, including Peel & Seal tape, a joint sealer, and LP TechShield, a reflective sheathing product.<br> <br> Back on the ground, construction consultant Steve Easley demonstrates how to install Tyvek wrap around the house.
  • Episode 4 - Fireplace and Porch Columns

  • Episode 5 - Metal Roofing and Windows

  • Episode 6 - Installing Garage Doors and Skylight

  • Episode 7 - Installing a Stairway

  • Episode 9 - Plaster and Trim Work

  • Episode 10 - Landscaping Begins

  • Episode 11 - Working on the Kitchen

  • Episode 12 - Completing the Living Room

  • Episode 13 - Final House Tour


Inspiration_banner

INSPIRATION GALLERY

Partners' Latest
 
webapp2