- Bob Vila TV Shows >
- Chicago Coach House > Episode 11: Cabinets and Whirlpool Tub Installed
Progress Report on the Coach House
Bob tours the completed living room and dining room of the coach house, then goes into the basement to see the work being done on the heating system. Base cabinets are installed in the kitchen and a whirlpool tub is installed in the master bedroom suite.
- Part 1: Progress Report on the Coach House
- Bob tours the completed living room and dining room of the coach house, then heads down into the basement to see the work that's been done on the heating system.
- Part 2: Installing a Whirlpool Tub
- Part 3: Kitchen Cabinets Installed
A coach house in Chicago is reborn! This project includes gutting and rebuilding the interior structure, finishing the basement, and adding a roof dormer. Local artists even show Bob how to give the newly renovated home some panache with a creative, Chicago-style decorating approach and faux-finish painting techniques.
Also from Chicago Coach House
-
Episode 1 - Coach House Tour
Description:
Bob and general contractor Ron Gan assess the next project: a deserted old coach house. They discover several clues as to how the renovation should be done, and Bob pokes around in the attic for treasures. Plus, architectural historian Susan Benjamin takes Bob on a tour of some of downtown Chicago's 19th-century landmark buildings. -
Episode 2 - Plans Discussed and Demolition Begins
-
Episode 3 - Excavation Begins
-
Episode 4 - Ceiling and Stairs
-
Episode 5 - Roof Demolition
-
Episode 6 - Windows Installed
-
Episode 7 - Fireplace and Staircase
-
Episode 12 - Finishing Touches and Landscaping
-
Episode 13 - House Tour
More From This Episode
MOST POPULAR
MOST SHARED
MOST VIEWED VIDEO
Follow Us




















