Pouring the Basement Slab

Project: Two-Family Greystone, Episode 6, Part 1



The concrete basement floor is poured, leveled, and screeded. General contractor Ron Gan repairs a broken window pane the old-fashioned way, and Bob discusses the electrical layout for the first floor with electrician Slav Witowski.
Part 1: Pouring the Basement Slab
The concrete basement floor is poured, leveled, and screeded.
Part 2: Repairing a Broken Window Pane
Part 3: Electric Layout
Bob Vila tracks the progress of a two-family greystone in Chicago's Wicker Park neighborhood that is undergoing renovation. The project documents a low-budget upgrade of the building's two apartments and concludes with a decorator's tour showcasing the eye-catching results.