Florida Kitchen Cabinet Installation

Rating:

Log in to rate this video - Click Here

Read Video Description

Florida Kitchen Cabinet Installation

CLOSE

Richard Wagner of Wagner Cabinetry is in Punta Gorda for the installation of Cardell Maple cabinets. He starts with an overhead box that is marked for placement using a laser level. Since the exterior walls are concrete and the wall studs are steel, Bob asks how they handle installation. Wagner explains that as with wood, it's a matter of finding a stud and tacking with a finish nail before screwing the cabinets in place. Once tacked, the cabinets are checked again for level and screwed together with 2 1/2-inch flathead, square drive, zinc-coated screws with wood master tips that are serrated and cut through wood like a drill bit. With these screws, Wagner can avoid pre-drilling. After the doors are reattached and adjusted for swing, the crew moves to the base cabinet, which is nearly level and needs only be shimmed in the back. It is checked with a laser line at the wall and two feet out before being drilled in and finished with a toe kick. Bob shows the crown molding that is glued and tacked in place at the top of the cabinets for a finished look. More information

Email this video to a friend

E-Mail to a friend!

CLOSE

Note: The sender's and recipient's email address are used only to send the link on your behalf. They will not be used for any other purposes or stored in our database without your permission.






 

About | FAQ | Contact | Sitemap | Privacy Policy | Terms of Use | Help | bobvilacontractors
© BobVila.com 2008