Log in to rate this video - Click Here
Bob Vila shows a Victorian Style house where the rough plumbing is being installed. The house has a half basement with the remainder being just crawlspace. Bob meets Jim Timino the plumbing contractor who is running PVC pipe for the rough plumbing. Jim is installing a 2" waste line from the kitchen that will run to the main waste stack or piping. The main waste piping is 4" PVC and it runs into the sewer system in the backyard. Jim demonstrates how to properly cement or glue PVC fittings with the PVC pipe. They also take a look at the master bedroom suite, which will be magnificent because of its roominess and the extravagant master bathroom. They show the vent piping from the basement to the roof including a future vent that is required by Massachusetts Plumbing Code. The vent pipes allow proper drainage as well as a place for sewer gas to be expelled outside of the home. Bob tours the upstairs children’s bedrooms and overviews the header vent pipe and how it interconnects all the waste pipes in the home. More information
|
|
||
|
|
About | FAQ | Contact | Sitemap | Privacy Policy | Terms of Use | Help | bobvilacontractors © BobVila.com 2008 |
|