Once the PEX tubing is in place, the concrete is poured. Using ReddiForm blocks lets the crew pour the lower walls and the slab all at once. The side walls are supported by a vertical bracing and scaffolding system, which prevent the walls from being blown out during the pour. Once the concrete is poured, the second floor and gable end wall be started. More information