Log in to rate this video - Click Here
One of the home improvement projects for the Melrose home was to repair the chimney. The chimneys for the furnace and the fireplace were both in need of repair. The furnace chimney flue needed to be relined to meet code. A flexible stainless-steel liner will protect the home from fire danger or carbon monoxide poisoning. Jack Frederick of Frederick Gerraghty reviews some of the technology that went into the fireplace. The pipe used in this project had a double wall which protects the heat of the natural draft needed to properly vent chimneys. Three-foot, twist-lock lengths of pipe were assembled on site and dropped down from the top of the chimney. The fireplace chimney needed urgent attention both inside and out, so a new gas fireplace insert could go in the hearth opening. There was a lot of damage to the brick at the top of the chimney. The bricks were removed and replaced by Tim Martinson of Upside Down Chimney Sweeps. Some of the bricks were very loose and were removed and re-mortered. More information
|
|
||
|
|
About | FAQ | Contact | Sitemap | Privacy Policy | Terms of Use | Help | bobvilacontractors © BobVila.com 2008 |
|