Make sure that the stucco is flashed so that the water is directed out of the building enevlope and all openings are detailed and inspected before applying any wire lath. Also ASTM C-926 requires a 3 coat application of 7/8" thickness. Most paint will require a 30 day waite for the stucco to cure.