I am building a new house a the contractor poured the basement floor as three seperate sections. This has resulted in a hairline crack where the sections meet. Is tis anything to be worried about?
Also there are a couple of low spots where water collects (we havent started framing and it rained). Short of forcing him to pull out the concrete and pitch toward floor drain, what are my options?