I am trying to install a bathroom in my basement. The current plumbing is all cast iron and I plan on converting it to PVC. The problem I have is attaching the PVC to the Cast Iron under the concrete floor. I know of a few of the products on the market but after I chip up the concrete floor all the way from where my toilet is going how do I connect it when the cast iron is sunk in the floor?